wow gold

2011年9月20日星期二

Rail line no.2 issue ningbo jiangbei section engineering complete the total amount more than eighty percent

Ningbo rail lines a phase of jiangbei period demolition work is to promote, a few days ago, white sands of the demolition work has substantial streets all over, complete demolition to pay. Up to now, jiangbei complete rail lines a period for the demolition project 83% of the total.

It is reported, a total construction area of the white sands street is 4867 square meters, and the residential 36 families involved, as regards 5 home, last may get house dismantlement permit, the end of June this year completed all signing, the demolition, the land unknotting work has been completed all, with the fully operative conditions, which in the entire rail line no.2 a phase of demolition work in the front row, in to investigate accelerating rail lines first period engineering construction to have the important meaning. At present, the area of the white sands has to complete all related to pay.

Rail lines a phase CaQianLiang jiangbei period accounts for about 50% of the total amount, all 116600 square meters, involved in horses, bai sha, YongJiang, KongPu four streets. The orbit transportation construction belongs to the city of the key projects, time tight, task. To ensure that the rail lines demolition work successfully completed, in the district committee and the district government, the attention of the relevant street do your best, grasp the nettle jiangbei, crucial to catch progress, promote, demolition, now engineering along of demolition work has access to the SaoWei stage.

Rail lines a phase of rail transportation network is in the northeast of southwest--the backbone of the line, from lishe airport, and ultimately to the east, north eastern bypass stood at 28.35 km, in the jiangbei has peach crossing road station, thoroughfare road station, ring road station, automobile market stand, YongJiang station, KongPu stand, LuLin market stand, stand, build ningbo university stood and nine sites, about 9.83 kilometers, among which, YongJiang station, standing, build thoroughfare road station will be realized respectively and 3, 5, and 6 transfer line. After the completion of the great ease traffic pressure will investigate, for citizens to travel along the jiangbei provide convenience.
(wow gold) http://www.wow77.com (buy wow gold)
(diablo 3 powerleveling) http://www.myd3gold.com (diablo 3 gold)
(wow gold) http://www.wow-gold-team.com (buy wow gold)
(buy diablo 3 gold) http://www.myd3gold.com (diablo 3 gold)

World of Warcraft FAQs, World of Warcraft Tips ,  World of Warcraft equipment ,   World of Warcraft Guide ,  Warcraft skills ,  Pictures of warcraft ,  Lovely Girl Warcraft,

没有评论:

发表评论